FORD 99-03 7.3L STAGE 2 LONG LEAD INJECTOR SET 25 PERCENT OVER DYNOMITE DIESEL

$3,616.33

SKU: DDP.AE-2

Core *
Description

Description

Ford 99-03 7.3L Powerstroke Injector Set: Brand new (not reman) stage 2 injector set that’s been fully balanced with 140cc injector bodies and 25 percent over nozzles. Comes with long lead injector for cylinder #8.

Approximately 75-100 RWHP gains over stock with proper supporting modifications. Great for a hot street truck with light duty towing. Turbo upgrade mandatory if towing frequently or heavy.

Note: This injector set is intended for vehicles which have the long lead injector in cylinder #8. If you are unsure or do not want to take the time to check then order DDP AD-2

Details:

  • Liter: 7.3
  • Engine: Powerstroke
  • Years: 1999-2003
  • Fuel Type: Diesel
  • Condition: New
Additional information
Brand

Dynomite Diesel

Brand

Brand

Dynomite Diesel

Vehicle Fitment
Make Model Engine Year
Ford Powerstroke 7.3 1999 - 2003
Get $10 Off Your First Purchase!
Enter your name and email address and we'll send you a $10 off coupon for your first order!
Thanks for signing up. You must confirm your email address before we can send you. Please check your email and follow the instructions.
We respect your privacy. Your information is safe and will never be shared.
Don't miss out. Subscribe today.
×
×
Please verify the fitment of this product before ordering. All Electronic Items are Non-Refundable.
Don't miss out. Subscribe today.
×
×
This product is designed and manufactured for use only on competition motor vehicles participating in sanctioned closed-course, off-road, competitive Racing. Use of this product on Motor Vehicles that are licensed and registered to drive on public roads and highways is prohibited. By accepting this you agree that this product will not be used on a registered motor vehicle for highway use. Also, agreeing to this you take for responsibility for your actions and not hold Blood Diamond Motorsports liable for unlawful use of this product.
Don't miss out. Subscribe today.
×
×