FORD 99-03 7.3L STAGE 2 LONG LEAD INJECTOR SET 25 PERCENT OVER DYNOMITE DIESEL
$3,616.33
SKU: DDP.AE-2
Description
Description
Ford 99-03 7.3L Powerstroke Injector Set: Brand new (not reman) stage 2 injector set that’s been fully balanced with 140cc injector bodies and 25 percent over nozzles. Comes with long lead injector for cylinder #8.
Approximately 75-100 RWHP gains over stock with proper supporting modifications. Great for a hot street truck with light duty towing. Turbo upgrade mandatory if towing frequently or heavy.
Note: This injector set is intended for vehicles which have the long lead injector in cylinder #8. If you are unsure or do not want to take the time to check then order DDP AD-2
Details:
- Liter: 7.3
- Engine: Powerstroke
- Years: 1999-2003
- Fuel Type: Diesel
- Condition: New
Additional information
| Brand | Dynomite Diesel |
|---|
Brand
Brand
Dynomite Diesel
Vehicle Fitment
| Make | Model | Engine | Year |
|---|---|---|---|
| Ford | Powerstroke | 7.3 | 1999 - 2003 |







