FORD 99-03 7.3L STAGE 1 LONG LEAD INJECTOR SET 15 PERCENT OVER DYNOMITE DIESEL
$3,616.33
SKU: DDP.AE-1
Description
Description
Ford 99-03 7.3L Powerstroke Injector Set: Brand new (not reman) stage 1 injector set WITH long lead injector for cylinder #8. New injectors have been fully balanced with 140cc injector bodies and 15 percent over nozzles. Approximately 50 RWHP over stock. Safe on stock trucks. Excellent for towing applications.
Note: This injector set is intended for vehicles which have the long lead injector in cylinder #8. If you are unsure or do not want to take the time to check then order DDP AD-1
Details:
- Liter: 7.3
- Engine: Powerstroke
- Years: 1999-2003
- Fuel Type: Diesel
- Condition: New
Additional information
| Brand | Dynomite Diesel |
|---|
Brand
Brand
Dynomite Diesel
Vehicle Fitment
| Make | Model | Engine | Year |
|---|---|---|---|
| Ford | Powerstroke | 7.3 | 1999 - 2003 |







