FORD 99-03 7.3L INDIVIDUAL STOCK #8 LONG LEAD INJECTOR DYNOMITE DIESEL
$380.00
SKU: DDP.AENEW
Description
Description
Ford 99-03 7.3L Powerstroke Injector: Brand New (not reman) long lead injector intended for cylinder #8 on some 99-03 7.3L engines. Stock power level injector. Sold individually with all the latest revisions.
Note: This particular injector is solely intended for the #8 cylinder on some engines which came equipped with what’s known as a long lead injector installed in that cylinder. If you are unsure what your engine came equipped with or do not want to take the time to check then order DDP ADNEW for the #8 cylinder and the other seven cylinders if needed.
Details:
- Liter: 7.3
- Engine: Powerstroke
- Years: 1999-2003
- Fuel Type: Diesel
- Condition: New
Additional information
| Brand | Dynomite Diesel |
|---|
Brand
Brand
Dynomite Diesel
Vehicle Fitment
| Make | Model | Engine | Year |
|---|---|---|---|
| Ford | Powerstroke | 7.3 | 1999 - 2003 |





